User manual TGB TARGET 525 SERVICE MANUAL
DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!
If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual TGB TARGET 525. We hope that this TGB TARGET 525 user guide will be useful to you.
Manual abstract: user guide TGB TARGET 525SERVICE MANUAL
Detailed instructions for use are in the User's Guide.
[. . . ] TARGET 525
SERVICE MANUAL
TAIWAN GOLDEN BEE CO. , LTD.
PDF created with pdfFactory Pro trial version www. pdffactory. com
Homepage
Contents
FORWARD
This service manual contains the technical data of each component inspection and repair for the 525 ATV. The manual is shown with illustrations and focused on "Service Procedures", "Operation Key Points", and "Inspection Adjustment" so that provides technician with service guidelines. If the style and construction of the ATV 525, are different from that of the photos, pictures shown in this manual, the actual vehicle shall prevail. Specifications are subject to change without notice.
Service Department TAIWAN GOLDEN BEE CO. , LTD.
PDF created with pdfFactory Pro trial version www. pdffactory. com
Homepage
Contents
HOW TO USE THIS MANUAL
This service manual describes basic information of different system parts and system inspection & service for 525 ATV. In addition, please refer to the manual contents in detailed for the model you serviced in inspection and adjustment. [. . . ] Install the parts as show.
Insert the bearing to the joint and turning the joint. If excessive play is noted, must be replace the new bearing.
Reassemble the driven output rear shaft and front shaft. After The tooth contact and backlash have been adjusted and checked.
9-5
PDF created with pdfFactory Pro trial version www. pdffactory. com
9. FINAL DRIVING MECHANISM
Reassembly driven output rear shaft Before reassembly thoroughly clean all parts with solvent.
Using a vise hold the bevel gear. Torque: 100N-m (10kgf-m, 73lb-ft)
Stake the nut with a punch.
Apply grease to the bearing and seal lip.
9-6
PDF created with pdfFactory Pro trial version www. pdffactory. com
9. (The oil seal lip should be positioned joint yoke side. ) Using a vise hold the driven output rear shaft. After The tooth contact and backlash have been adjusted and checked.
Put the bearing rings and shaft in the crankcase. (Tooth face contact 80% up) Remove the driven output Rear/Front shaft. Tighten the bevel gear nut and output rear shaft to the specified torque. Torque: 100N-m(10kgf-m, 73lb-ft) Stake the nut with a punch The bearing knock-pin should be outside.
9-7
PDF created with pdfFactory Pro trial version www. pdffactory. com
9. FINAL DRIVING MECHANISM
Tooth contact: face contact 80% up
Using the tool to install the bearings and joint. When the tooth contact and backlash have been adjusted or checked.
Tool: 440668
Install the new c-ring by tapping and hammer. ( copper ) Using the new c-ring for reassembly.
After reassembling the universal joint assy. Tapping the bearing with the plastic mallet lightly.
9-8
PDF created with pdfFactory Pro trial version www. pdffactory. com
9. FINAL DRIVING MECHANISM
FINAL ASSEMBLY
l After adjusting tooth contact correctly, remove the Front and rear output shafts and drive bevel gear. l Clean off any dye or paste from the gear teeth, and lubricate the teeth with engine oil. l Tighten the drive bevel gear nut and rear out put Shaft nut to the specified torque.
Rear output shaft nut:100 NM(10. 0 kgf- m, 73 lb-ft) Drive bevel gear nut:100 NM(10. 0 kgf- m, 73 lb-ft)
l Stake the collar of the nut into the notch in the shaft.
NOTE:
After the tooth contact have been checked and adjusted reassemble the joint.
9-9
PDF created with pdfFactory Pro trial version www. pdffactory. com
9. FINAL DRIVING MECHANISM
ENGINE REASSEMBLY
NOTE:
When reassembly the engine pay attention, apply engine oil to sliding parts and running parts before re-assembling.
CAUTION
Be sure keep the drive belt, drive face and driven face away from any greasy matter.
l Install the output shaft assembly with a plastic mallet. l Install the shim drive bevel gear and washer.
l Tighten the bevel gear nut to the specified torque.
Bevel gear nut torque:100 NM(10. 0 kgf- m, 73 lb-ft)
l Use a center punch stake the nut.
9-10
PDF created with pdfFactory Pro trial version www. pdffactory. com
9. FINAL DRIVING MECHANISM
DRIVE TRAIN
l Install the rear and front out put shaft. l Install the C-ring.
NOTE:
Must fit the pins on the bearing into the groove of the crankcase.
TRANSFER/GEARSHIFT
l Install the transfer related parts.
l Install the spacer spring, shaft and reverse idle gear. [. . . ] ELECTRICAL SYSTEM
Headlight Switch
Pin Position
Headlight switch
BAT3
LO
HI
PL
Wire color
Red
Red Red Blue /Green /Yellow /Brown
Winker switch
Pin Position L WR R
N PUSH OFF
Wire color
Brown
Brown / White
Green
Winker switch Winker switch
Horn switch
Pin Position FREE BAT3 HO
Wire Color
Brown/ White
Pink
Horn switch
Hazard switch
Pin Position HD E
Hazard switch
Wire Color
Brown / White
Black
17-17
PDF created with pdfFactory Pro trial version www. pdffactory. com
To this chapter contents
17. ELECTRICAL SYSTEM
Front Brake Switch
While grasp the brake lever firmly, the terminals of brown/blue and green/yellow of the brake should have continuity. Replace the switch if damaged.
Brake light switch
Rear Brake Switch
While grasp the brake lever firmly, the terminals of white/black and Brown/White of the brake should have continuity. Replace the switch if damaged.
Brake light switch
Horn
Remove the horn from front fender.
1 bolt
Apply 12 V power source to two terminals of the horn, the horn should sound. [. . . ]
DISCLAIMER TO DOWNLOAD THE USER GUIDE TGB TARGET 525
Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual TGB TARGET 525 will begin.